Success Stories
Lusail CP1
Background
The CP1 Utility Tunnel is approximately 12km long with cross lateral sections of tunnel to service the Lusail Development Marina plots. The tunnel has separate wet and dry sections that support mainly electrical and fibre-optic cabling on the dry and potable water district cooling and irrigation on the wet as well as other services. The tunnel structure itself is supported by 28 fan rooms of between 4 and 12 fans and control systems. These supply the ventilation system to the tunnel, used for ventilation heat/atmosphere controlling as well as smoke purging. Within the tunnel and fan rooms there are linear heat detectors and fire reels and extinguishers installed. The emergency systems also include emergency lighting that has battery backup.
Services
Irinatech’s experienced and dedicated team took up the project management work and its associated challenges.
Irinatech provided a comprehensive MEP project management and engineering services package to all aspects of the MEP execution works.
Our core responsibility was to provide support to the main contractor in terms of planning, engineering, management and site supervision. We assisted and supported the main contractor and managed all 15 subcontractors with all inter-related MEP works including design, installation, testing and commissioning, training and handover, to complete a prestigious infrastructure project valued at approximately QR5 billion.
Irinatech is also providing full guidance to contractual documentation in all aspects of the project life cycle. KPIs were submitted to the client on a weekly/monthly basis for all types of risk and uncertainties including contractual, financial, safety, liaison with all authorities, QA/QC, health and safety, project closure procedure and documentation.
Projects Details
-
Location:
Qatar -
PM/CM
Parsons -
Main Contractor
Sinohydro -
Sector
Infrastructure -
Scope
Comprehensive MEP project management, and engineering services packages to all aspects of the MEP execution works