Lusail City CP1 - 66kV & 11kV Substation

Irinatech is providing a comprehensive MEP Project Management, and Engineering services package to all aspects of the MEP execution Works. Our core responsibility is to provide support to the main contractor in terms of Planning, Engineering, Management and Site supervision, assist and support the main contractor and manage all respective subcontractors (15No’s) with all interrelated MEP works including Design, Installation, Testing and Commissioning, Training and Handover, to complete a prestigious infrastructure project valued at approximately QR 5 Billion.

Irinatech is also providing full guidance to contractual documentation in all aspects of the project life cycle. Other (KPI’s) are advise to the client on weekly monthly basis of all types of risk and uncertainties including Contractual, Financial, Safety, Liaison with all authorities, QA/QC, Health and Safety, Project closure procedure and Documentation.

The Power systems within CP1 will be all fed from the Kahramaa LDS1 220kv / 66kv substation. The 66kV Substations M1. M2 and M3 will be fed from 66kV cables that are run though the Utility Tunnel. The 66kV Substation at Energy city will have a buried 66kV cable route. From these four 66kV / 11kV substations a network of 11kV cables will feed 40 x 11kV substations across CP1. On completion all of these substations will be owned and operated by Kahramaa Power Authority.

Projects Details

  • Sector

    Infrastructure
  • Scope

    Construction and Project Management